Skip to content
Instacertify
CallFree quote

IS 302 PART 1 :2024

Navigating the Indian regulatory ecosystem requires a precision-led approach to safety. The IS 60335 series, primarily governed by IS 302, is the mandatory benchmark for electrical appliance safety. Adherence ensures you...

4.9/5Rated by 28 clients

How IS 302 PART 1 :2024 works

  1. 1Assessment of requirement
  2. 2Sample collection
  3. 3Right lab assigned
  4. 4Testing
  5. 5Test report
Each step explained

Free Expert Assessment

Free assessment. We reply within 1 business day.

Trusted by Leading Brands Across the Globe

Overview of IS 302 PART 1 :2024

Navigating the Indian regulatory ecosystem requires a precision-led approach to safety. The IS 60335 series, primarily governed by IS 302, is the mandatory benchmark for electrical appliance safety. Adherence ensures your products withstand rigorous environmental and electrical stresses while maintaining market legality.

  • Regulatory Shield: Mitigates legal risks by aligning with the latest Quality Control Orders (QCO).
  • Operational Excellence: Ensures product durability through standardized thermal and mechanical stress tests.
  • Consumer Confidence: High visibility of the ISI Mark serves as a silent salesman.
  • Global Parity: Harmonized with IEC standards for seamless international trade.

Applicable Standards

Governing Framework

The primary legislative standard is IS 302 (Part 1): 2024, which is a direct adoption of IEC 60335-1: 2020. It is critical to note that Part 1 serves as the "General Requirements" and must always be paired with the relevant Part 2 (Particular Requirements) specific to the appliance's function.

Products Covered

Product Taxonomy & Applicability

The scope of this standard is vast, covering equipment with rated voltages up to 250V (single-phase). High-priority categories include:

  • Thermodynamic Appliances: Water heaters, immersion rods, and electric irons.
  • Kitchen Automation: Microwave ovens, mixers, grinders, and induction hobs.
  • Environmental Control: Air conditioners, ceiling fans, and room heaters.
  • Grooming Electronics: Hair dryers, shavers, and massagers.

Scope of Testing

Critical Evaluation Parameters

Our testing roadmap covers the full spectrum of the IS 302 safety protocols:

  • Dielectric Integrity: Testing insulation under high-voltage stress.
  • Abnormal Operation: Simulating fan failures or blocked rotors to prevent fire hazards.
  • Ingress Protection: Evaluating resilience against moisture and dust (IP ratings).
  • Constructional Audit: Verifying internal wiring, creepage distances, and clearance gaps.

Accreditation

Accredited Laboratory Network

Compliance is only valid if the Test Report is issued by a laboratory holding NABL Accreditation (ISO/IEC 17025) and formal BIS Recognition. We ensure your samples are processed through labs that maintain the highest calibration standards required for ISI marking.

Timeline

Certification Milestone Roadmap

  • Phase 1: Technical Gap Analysis: 1 week.
  • Phase 2: Laboratory Testing: 3–4 weeks (depending on the Part 2 complexity).
  • Phase 3: BIS Audit & Grant: 4–6 weeks for inspection and final review.
  • Total Lifecycle: Typically 10 to 12 weeks for a fresh license grant.

Sample Required

Logistics for Product Sampling

  • Primary Samples: 2 to 3 complete units in final retail packaging.
  • Critical Components: Unmounted components like PCBAs, motors, and power cords may be required for independent "component-level" testing if they lack individual BIS certification.

Cost & Fees

Financial Investment Structure

The cost is categorized into three tiers:

  1. Professional Service Fee: For documentation and end-to-end liaison.
  2. Statutory BIS Fees: Application, audit, and annual minimum marking fees.
  3. Laboratory Charges: Variable based on the specific "Part 2" testing requirements. Contact our technical desk for a precise, itemized quote.

Documentation

Mandatory Compliance Dossier

To initiate the filing, the following documentation must be digitally organized:

  • Technical File: Circuit diagrams, exploded views, and Critical Component List (CCL).
  • Business Proof: GST registration, MSME/Udyam certificate, and Brand Authorization.
  • User Documentation: Product manuals with mandatory safety warnings in English and Hindi.
  • Plant Layout: Details of manufacturing machinery and in-house testing equipment.

How we handle IS 302 PART 1 :2024

  1. 1

    Assessment of requirement

    We confirm the standard, the list of tests and how many samples your product needs.

  2. 2

    Sample collection

    We collect the samples from your factory or warehouse, or tell you exactly where to send them.

  3. 3

    Right lab assigned

    We choose an accredited lab (NABL, BIS-recognised or ILAC) that covers your standard and can start soonest.

  4. 4

    Testing

    The lab tests your samples against the standard. We follow up and tell you at once if a test fails.

  5. 5

    Test report

    You receive the signed test report, ready to use for BIS, WPC, CE or your buyer.

Frequently asked questions

What is the significance of the 2024 update for IS 302-1?

The 2024 revision aligns Indian standards with IEC 60335-1:2020. It introduces mandatory requirements for battery-operated appliances and cybersecurity protocols, ensuring Indian products meet modern global safety benchmarks.

Is it possible to obtain a BIS license without a factory audit?

No. A physical or remote factory inspection by a BIS officer is mandatory. The auditor verifies manufacturing infrastructure, quality control processes, and the presence of in-house testing facilities.

Does a single test report cover all models in a product family?

BIS allows "grouping" where a lead model undergoes full testing. However, variety models require "partial testing" to cover differences in design, rating, or components to ensure total compliance.

How often must the ISI license be renewed for electrical appliances?

Initial licenses are usually granted for one or two years. Renewals are required periodically, contingent upon satisfactory performance in market surveillance and adherence to the latest marking fee schedules.

What happens if an appliance fails a specific safety test?

In the event of a failure, the manufacturer must analyze the root cause, implement technical design changes, and submit a fresh sample for re-testing to ensure safety standards.

Are imported appliances exempt from the IS 60335 requirements?

Imported appliances fall under the Foreign Manufacturers Certification Scheme (FMCS). They must comply with the same IS 302 standards and obtain a BIS license before entering the Indian market.

What our clients say

“Instacertify helped us get BIS CRS certification for our entire product range within just 6 weeks. Their team handled everything from documentation to lab coordination. Highly professional service.”
Akash GuptaBIS CRS · Electronics brand
“They handled complete certification for us, from ISO 9001 to BIS for PVC cables and plugs. Thorough, professional and always available — they knew what needed to be done and when.”
Shivank VishnoiISO 9001 & BIS · Cables
“Getting TEC approvals for our access-control products seemed confusing and complex, but Instacertify made it simple.”
Jiten ShahTEC approval · Access control

Not sure which certification you need?

Send us the product name and the countries you sell in. A specialist replies with the standards that apply, the documents to prepare, the lab cost and the timeline. The assessment is free.

  • The list of approvals comes to you in writing
  • Get Started with the Right Expert
  • Testing, certification and registrations handled by one team
Get a free assessment

Free Expert Assessment

Free assessment. We reply within 1 business day.

CallWhatsAppFree quote

Free Expert Assessment

Free Expert Assessment

Free assessment. We reply within 1 business day.

Prefer to talk? +91 99991 18039 or WhatsApp