Skip to content
Instacertify
CallFree quote

EV Battery Testing (AIS-156 & AIS-038)

AIS-156 and AIS-038 Rev. 2 specify safety and performance requirements for traction batteries used in electric vehicles in India. AIS-156 applies to L-category vehicles, including electric two-wheelers, three-wheelers and quadricycles, while AIS-038 Rev. 2 covers M and N-category electric vehicles, including cars, buses and trucks. Testing evaluates battery safety, durability and protection against electrical, thermal and mechanical hazards. Key evaluations include vibration, thermal shock, mechanical shock, external short circuit, overcharge, over-discharge, fire resistance and thermal propagation. Instacertify coordinates EV battery testing, pre-compliance assessments and laboratory documentation to support vehicle manufacturers and battery suppliers.

4.9/5Rated by 28 clients

How EV Battery Testing (AIS-156 & AIS-038) works

  1. 1Requirement Assessment1–2 Days
  2. 2Documentation & Sample Preparation2–3 Days
  3. 3Testing Plan & Laboratory Selection2–3 Days
  4. 4Battery Sample Evaluation & Setup3–5 Days
  5. 5EV Battery Safety & Performance Testing2–5 Weeks
  6. 6Test Report & Approval Support3–5 Days
Each step explained

Free Expert Assessment

Free assessment. We reply within 1 business day.

Trusted by Leading Brands Across the Globe

Overview of EV Battery Testing (AIS-156 & AIS-038)

Tested by
CMVR testing agency
Regulation
AIS-156 & AIS-038 Rev 2
Typical turnaround
4–8 weeks
Sample needed
Packs and cells per standard

Traction batteries for electric vehicles must meet AIS-156 (two- and three-wheelers, L category) or AIS-038 Rev 2 (cars, buses and trucks, M and N categories) as part of type approval under the Central Motor Vehicles Rules. After a series of electric scooter fires in 2022, the requirements were strengthened with tests on thermal propagation, cell-level safety and battery management functions.

The pack must survive vibration, thermal shock, mechanical shock and crush, fire resistance, external short circuit, overcharge, over-discharge and over-temperature, and meet ingress protection requirements. Cells are tested to their own standards. Pre-compliance testing helps battery and vehicle makers fix design weaknesses before booking scarce type-approval slots.

What we do for you

  • Lab and parameter list chosen for your purpose: licence, export, buyer or internal QC
  • Sampling guidance, and pickup or on-site sampling where needed
  • One contact who follows up with the lab until the report is issued
  • Report explained in plain language, with next steps if a result fails

    What to send

    The lab confirms the exact quantity and packing for your product when we book the test.

    Sample

    • Quantity: Packs and cells per standard
    • Sealed and labelled with the product name, batch number and date
    • Packed securely so that it is not damaged in transit

    Details to share

    • Product name, material or grade and intended use
    • Drawings or specifications, where relevant
    • The standard or buyer specification to test against
    • Markets where the product will be sold

    Procedure to get EV Battery Testing (AIS-156 & AIS-038)

    1. 1

      Requirement Assessment

      1–2 Days

      We review battery specifications, vehicle categories, battery chemistry and intended applications to identify the applicable AIS-156 or AIS-038 Rev. 2 requirements and testing scope.

    2. 2

      Documentation & Sample Preparation

      2–3 Days

      We verify battery datasheets, cell specifications, battery pack drawings, BMS details, technical documents and sample requirements. We also guide manufacturers regarding sample identification and safe transportation.

    3. 3

      Testing Plan & Laboratory Selection

      2–3 Days

      We identify applicable safety tests, testing parameters and sample quantities. We coordinate with suitable NABL-accredited laboratories or CMVR-notified testing agencies according to the testing purpose.

    4. 4

      Battery Sample Evaluation & Setup

      3–5 Days

      The laboratory checks battery configurations, electrical connections, mounting arrangements, BMS functionality and required test conditions before starting the evaluation.

    5. 5

      EV Battery Safety & Performance Testing

      2–5 Weeks

      The laboratory performs applicable vibration, mechanical shock, thermal shock, thermal propagation, external short circuit, overcharge, over-discharge, fire resistance and ingress protection tests to evaluate battery safety and reliability.

    6. 6

      Test Report & Approval Support

      3–5 Days

      We coordinate the laboratory test report, review test observations and assist with documentation and follow-up for the applicable vehicle type approval and conformity requirements.

    What the lab tests

    ParameterWhy it is checked
    Vibration and mechanical shockRoad loads on the pack
    Thermal shock and cyclingSeal and connection integrity
    Thermal propagationOne cell failing must not spread
    External short circuit, overcharge, over-dischargeProtection by the BMS
    Fire resistancePack exposed to external fire
    Ingress protectionWater and dust

    The final list depends on your product, its standard and the purpose of testing. We confirm it with you before the sample goes to the lab.

    Frequently asked questions

    Do battery packs need BIS certification as well?

    Cells and packs may also fall under BIS standards depending on the product and application, separate from CMVR type approval. We map both requirements for your battery before testing.

    Which standard is the product tested against?

    The Indian Standard, international standard or buyer specification that applies to your product and market. We confirm it with you before testing, and the report states the method used for each parameter.

    Who carries out the testing?

    Type approval tests under CMVR are done by government-notified testing agencies. Development and pre-compliance tests can be done at our NABL-accredited partner labs first, so the type approval test passes the first time. We coordinate both and follow up until the certificate is issued.

    What our clients say

    “Instacertify helped us get BIS CRS certification for our entire product range within just 6 weeks. Their team handled everything from documentation to lab coordination. Highly professional service.”
    Akash GuptaBIS CRS · Electronics brand
    “They handled complete certification for us, from ISO 9001 to BIS for PVC cables and plugs. Thorough, professional and always available — they knew what needed to be done and when.”
    Shivank VishnoiISO 9001 & BIS · Cables
    “Getting TEC approvals for our access-control products seemed confusing and complex, but Instacertify made it simple.”
    Jiten ShahTEC approval · Access control

    Not sure which certification you need?

    Send us the product name and the countries you sell in. A specialist replies with the standards that apply, the documents to prepare, the lab cost and the timeline. The assessment is free.

    • The list of approvals comes to you in writing
    • Get Started with the Right Expert
    • Testing, certification and registrations handled by one team
    Get a free assessment

    Free Expert Assessment

    Free assessment. We reply within 1 business day.

    CallWhatsAppFree quote

    Free Expert Assessment

    Free Expert Assessment

    Free assessment. We reply within 1 business day.

    Prefer to talk? +91 99991 18039 or WhatsApp