Skip to content
Instacertify
CallFree quote

EV Battery Testing (AIS-156 & AIS-038)

Get your EV traction battery through AIS-156 or AIS-038 Rev 2, with pre-compliance testing that catches failures before the type approval test.

4.9/5Rated by 28 clients

How EV Battery Testing (AIS-156 & AIS-038) works

  1. 1Assessment of requirement
  2. 2Sample collection
  3. 3Right lab assigned
  4. 4Testing
  5. 5Test report
Each step explained

Free Expert Assessment

Free assessment. We reply within 1 business day.

Trusted by Leading Brands Across the Globe

Overview of EV Battery Testing (AIS-156 & AIS-038)

Tested by
CMVR testing agency
Regulation
AIS-156 & AIS-038 Rev 2
Typical turnaround
4–8 weeks
Sample needed
Packs and cells per standard

Traction batteries for electric vehicles must meet AIS-156 (two- and three-wheelers, L category) or AIS-038 Rev 2 (cars, buses and trucks, M and N categories) as part of type approval under the Central Motor Vehicles Rules. After a series of electric scooter fires in 2022, the requirements were strengthened with tests on thermal propagation, cell-level safety and battery management functions.

The pack must survive vibration, thermal shock, mechanical shock and crush, fire resistance, external short circuit, overcharge, over-discharge and over-temperature, and meet ingress protection requirements. Cells are tested to their own standards. Pre-compliance testing helps battery and vehicle makers fix design weaknesses before booking scarce type-approval slots.

What we do for you

  • Lab and parameter list chosen for your purpose: licence, export, buyer or internal QC
  • Sampling guidance, and pickup or on-site sampling where needed
  • One contact who follows up with the lab until the report is issued
  • Report explained in plain language, with next steps if a result fails

What to send

The lab confirms the exact quantity and packing for your product when we book the test.

Sample

  • Quantity: Packs and cells per standard
  • Sealed and labelled with the product name, batch number and date
  • Packed securely so that it is not damaged in transit

Details to share

  • Product name, material or grade and intended use
  • Drawings or specifications, where relevant
  • The standard or buyer specification to test against
  • Markets where the product will be sold

How we handle EV Battery Testing (AIS-156 & AIS-038)

  1. 1

    Assessment of requirement

    We confirm the standard, the list of tests and how many samples your product needs.

  2. 2

    Sample collection

    We collect the samples from your factory or warehouse, or tell you exactly where to send them.

  3. 3

    Right lab assigned

    We choose an accredited lab (NABL, BIS-recognised or ILAC) that covers your standard and can start soonest.

  4. 4

    Testing

    The lab tests your samples against the standard. We follow up and tell you at once if a test fails.

  5. 5

    Test report

    You receive the signed test report, ready to use for BIS, WPC, CE or your buyer.

What the lab tests

ParameterWhy it is checked
Vibration and mechanical shockRoad loads on the pack
Thermal shock and cyclingSeal and connection integrity
Thermal propagationOne cell failing must not spread
External short circuit, overcharge, over-dischargeProtection by the BMS
Fire resistancePack exposed to external fire
Ingress protectionWater and dust

The final list depends on your product, its standard and the purpose of testing. We confirm it with you before the sample goes to the lab.

Frequently asked questions

Do battery packs need BIS certification as well?

Cells and packs may also fall under BIS standards depending on the product and application, separate from CMVR type approval. We map both requirements for your battery before testing.

Which standard is the product tested against?

The Indian Standard, international standard or buyer specification that applies to your product and market. We confirm it with you before testing, and the report states the method used for each parameter.

Who carries out the testing?

Type approval tests under CMVR are done by government-notified testing agencies. Development and pre-compliance tests can be done at our NABL-accredited partner labs first, so the type approval test passes the first time. We coordinate both and follow up until the certificate is issued.

What our clients say

“Instacertify helped us get BIS CRS certification for our entire product range within just 6 weeks. Their team handled everything from documentation to lab coordination. Highly professional service.”
Akash GuptaBIS CRS · Electronics brand
“They handled complete certification for us, from ISO 9001 to BIS for PVC cables and plugs. Thorough, professional and always available — they knew what needed to be done and when.”
Shivank VishnoiISO 9001 & BIS · Cables
“Getting TEC approvals for our access-control products seemed confusing and complex, but Instacertify made it simple.”
Jiten ShahTEC approval · Access control

Not sure which certification you need?

Send us the product name and the countries you sell in. A specialist replies with the standards that apply, the documents to prepare, the lab cost and the timeline. The assessment is free.

  • The list of approvals comes to you in writing
  • Get Started with the Right Expert
  • Testing, certification and registrations handled by one team
Get a free assessment

Free Expert Assessment

Free assessment. We reply within 1 business day.

CallWhatsAppFree quote

Free Expert Assessment

Free Expert Assessment

Free assessment. We reply within 1 business day.

Prefer to talk? +91 99991 18039 or WhatsApp