Skip to content
Instacertify
CallFree quote

Solar PV Module Testing

Ensure your solar panels meet essential quality, safety and performance requirements with professional Solar PV Module Testing services from Instacertify. We coordinate testing through suitable partner laboratories to evaluate power output, electrical insulation, moisture resistance and durability under demanding environmental conditions. Our testing support covers applicable Indian and international standards, including IS 14286, IEC 61215 and IS/IEC 61730. Whether you manufacture crystalline silicon or thin-film solar modules, we help you identify the right testing requirements, arrange laboratory evaluation and obtain test reports to support your BIS-related compliance, buyer requirements and product quality objectives.

4.9/5Rated by 28 clients

How Solar PV Module Testing works

  1. 1Understand Your Testing Requirements1–2 Days
  2. 2Documentation Sample Preparation2–3 Days
  3. 3Laboratory Coordination & Booking3–7 Days
  4. 4Solar PV Module Testing7–120 Days
  5. 5Test Report Evaluation3–5 Days
  6. 6Final Report & Compliance Guidance1–2 Days
Each step explained

Free Expert Assessment

Free assessment. We reply within 1 business day.

Trusted by Leading Brands Across the Globe

Overview of Solar PV Module Testing

Tested by
BIS-recognised partner lab
Regulation
IS 14286 & IS/IEC 61730
Typical turnaround
6–10 weeks
Sample needed
8–10 modules per type

Solar PV modules sold in India must be registered with BIS under the government’s order for solar photovoltaic products, based on tests to IS 14286 (the Indian adoption of IEC 61215, design qualification) and IS/IEC 61730 (safety). Manufacturers supplying government-backed and many other projects must also be on MNRE’s Approved List of Models and Manufacturers (ALMM).

The test sequence exposes modules to thermal cycling, damp heat, humidity-freeze, UV, mechanical load and hail, and checks power loss, insulation and wet leakage after each stress. Developers and lenders often add potential-induced degradation (PID) and electroluminescence (EL) imaging to catch cell cracks from transport and installation.

What we do for you

  • Lab and parameter list chosen for your purpose: licence, export, buyer or internal QC
  • Sampling guidance, and pickup or on-site sampling where needed
  • One contact who follows up with the lab until the report is issued
  • Report explained in plain language, with next steps if a result fails

    What to send

    The lab confirms the exact quantity and packing for your product when we book the test.

    Sample

    • Quantity: 8–10 modules per type
    • Sealed and labelled with the product name, batch number and date
    • Packed securely so that it is not damaged in transit

    Details to share

    • Model list with ratings, and the series or family you want covered
    • Circuit diagram, critical components list and user manual
    • The Indian Standard or IEC standard that applies
    • BIS registration or licence number, if you already have one

    Procedure to get Solar PV Module Testing

    1. 1

      Understand Your Testing Requirements

      1–2 Days

      We review your solar PV module specifications, product category and target market to identify the applicable Indian or international testing standards.

    2. 2

      Documentation Sample Preparation

      2–3 Days

      Our team guides you in preparing technical documents, product specifications and test samples required for laboratory evaluation.

    3. 3

      Laboratory Coordination & Booking

      3–7 Days

      We coordinate with suitable BIS-recognised or NABL-accredited partner laboratories and arrange sample submission according to the required testing scope.

    4. 4

      Solar PV Module Testing

      7–120 Days

      The laboratory conducts the required electrical, performance, environmental and safety tests. Duration depends on the applicable standards and test sequence, ranging from shorter performance tests to extended reliability qualification.

    5. 5

      Test Report Evaluation

      3–5 Days

      We coordinate the test results, review the laboratory report and help identify any observations or additional testing requirements.

    6. 6

      Final Report & Compliance Guidance

      1–2 Days

      We assist with collecting the final test report and provide guidance on the next steps for BIS certification, regulatory compliance or buyer requirements.

    What the lab tests

    ParameterWhy it is checked
    Maximum power at STCRated output and power tolerance
    Thermal cycling and humidity-freezeSolder bond and laminate durability
    Damp heatLong-term moisture resistance
    Mechanical load and hailWind, snow and impact
    Insulation and wet leakage currentElectrical safety
    PID and EL imagingDegradation risk and cell cracks

    The final list depends on your product, its standard and the purpose of testing. We confirm it with you before the sample goes to the lab.

    Frequently asked questions

    Why does module testing take two months?

    Damp heat alone runs for 1,000 hours, and thermal cycling for hundreds of cycles, on several modules in parallel sequences. The schedule is set by the standard, not the lab.

    Will BIS accept the report?

    For BIS registration and licences, testing is done at a lab recognised by BIS for that standard, and BIS accepts reports only from such labs. For tenders and buyers, a NABL-accredited lab report is usually enough. We confirm which applies before booking.

    Who carries out the testing?

    Instacertify’s partner laboratories, accredited by NABL to ISO/IEC 17025 for the parameters on your report. We choose the lab, arrange the sample, follow up until the report is issued and explain the results to you.

    What our clients say

    “Instacertify helped us get BIS CRS certification for our entire product range within just 6 weeks. Their team handled everything from documentation to lab coordination. Highly professional service.”
    Akash GuptaBIS CRS · Electronics brand
    “They handled complete certification for us, from ISO 9001 to BIS for PVC cables and plugs. Thorough, professional and always available — they knew what needed to be done and when.”
    Shivank VishnoiISO 9001 & BIS · Cables
    “Getting TEC approvals for our access-control products seemed confusing and complex, but Instacertify made it simple.”
    Jiten ShahTEC approval · Access control

    Not sure which certification you need?

    Send us the product name and the countries you sell in. A specialist replies with the standards that apply, the documents to prepare, the lab cost and the timeline. The assessment is free.

    • The list of approvals comes to you in writing
    • Get Started with the Right Expert
    • Testing, certification and registrations handled by one team
    Get a free assessment

    Free Expert Assessment

    Free assessment. We reply within 1 business day.

    CallWhatsAppFree quote

    Free Expert Assessment

    Free Expert Assessment

    Free assessment. We reply within 1 business day.

    Prefer to talk? +91 99991 18039 or WhatsApp